Social Studies Bell Ringer for Grades 6–8: The opening of the Holland Tunnel on November 13, 1927

Social Studies Grades 6–8 3–5 minutes Posted

A free social studies bell ringer for grades 6–8. Put the prompt on the board as students walk in, give them three to five minutes, then go over it together. The answer and teacher notes are in the box below the prompt.

The prompt

On November 13, 1927, the Holland Tunnel opened to traffic under the Hudson River, connecting Canal Street in Manhattan, New York, with Jersey City, New Jersey. It was the first underwater vehicle crossing of the Hudson and the first tunnel designed specifically for cars and trucks. It has two tubes: the north tube is 8,558 feet long and the south tube is 8,371 feet. At its deepest, the roadway is 93.4 feet below the river's high-water level. The tunnel was named for its engineer, Clifford M. Holland, who died before it was finished. (a) How many years ago did the tunnel open? (b) How much longer is the north tube than the south tube? (c) About how many miles long is the north tube? (5,280 feet = 1 mile.) (d) Before 1927, how might people and goods have crossed between Manhattan and New Jersey? Why would a tunnel matter for trade and jobs? (e) The tunnel was named to honor its engineer. Is naming a project after someone a good way to honor them? Defend your answer.

Answer and teacher notes

(a) 2026 − 1927 = 99 years (its 100th anniversary is next year). (b) 8,558 − 8,371 = 187 feet. (c) 8,558 ÷ 5,280 ≈ 1.6 miles. (d) Answers will vary: by ferry or boat; a tunnel lets trucks and cars cross in any weather and carry goods faster between two busy areas. (e) Answers will vary.

Check on (c): 1.6 × 5,280 = 8,448, close to 8,558 ✓; ASCE also describes the tunnel as 1.6 miles. A big engineering challenge was air: car exhaust builds up in a long tunnel. Britannica reports the tunnel has 84 powerful fans that can replace the air every 90 seconds. Ask students to work out how many times per hour that is (40). ASCE notes the builders dug using a shield that surrounded the work site as digging moved forward. Common mistake on (a): answering 100. Extension: find New York and New Jersey on a map and explain why a river border makes a tunnel or bridge valuable.

Source: Britannica: Holland Tunnel (opening date, endpoints, tube lengths, depth, 84 fans and 90 seconds, Clifford M. Holland); ASCE: Holland Tunnel (1.6 miles, first underwater vehicular crossing of the Hudson, first tunnel designed for cars and trucks, shield method)

See the full set for Friday, November 13, 2026

Free to use. Copy, print, project or adapt any of these for your students. If you share them online, please credit Daily Bell Ringers with a link. Not for resale. License: CC BY-NC 4.0.

Browse the full Bell Ringer Library by subject and grade.